Patologielabor

Anwendungsfall
July 10, 2025
Kategorie-Verbindung: Fertigcleanroom
Kurz: Discover the ISO 14644 Class 8 Modular Cleanroom GMP Pathology Engineering Cleanroom Solution, designed for hospital pathology labs, CDC facilities, and research institutions. This professional clean environment ensures accurate and safe pathological testing with precise temperature, humidity control, and air purification.
Verwandte Produktmerkmale:
  • Supports ISO Class 5-8 cleanliness levels, adaptable to various pathological testing needs.
  • Features anti-contamination design with adjustable negative/positive pressure zoning.
  • Equipped with airtight pass-through windows and high-efficiency filtration (H13/H14).
  • Modular assembly structure for quick installation and flexibility.
  • Intelligent temperature and humidity control for optimal testing conditions.
  • Includes real-time monitoring for temp, humidity, pressure, and particles.
  • Compliant with GMP/GLP and WS 233-2017 biosafety standards.
  • Designed for easy relocation or expansion with minimal downtime.
FAQs:
  • What is the lead time for a modular cleanroom?
    Standard configurations take 2-4 weeks for production and 1-2 weeks for installation. Custom designs may require 6-8 weeks.
  • Can the cleanroom be relocated or expanded later?
    Yes, modular cleanrooms are designed for flexibility. Walls, ceilings, and filtration systems can be disassembled and reinstalled. Expansion integrates seamlessly with existing structures.
  • How is air cleanliness maintained during power outages?
    Emergency power options like UPS/battery backups sustain airflow briefly. For prolonged outages, redundant power supplies and airlocks are recommended. The cleanroom recovers quickly post-outage.
Ähnliche Videos

Shedding CytologyLabor

Anwendungsfall
December 08, 2025

Färbe- und Montageraum

Anwendungsfall
December 08, 2025

modularer Cleanroom

Anwendungsfall
November 18, 2025

Eckluftdusche

Air Shower
June 11, 2025

Standard-Luftdusche

Air Shower
July 03, 2025

GCC-Workshop-Video

Guangzhou Cleanroom Construction Co., Ltd. wurde von den chinesischen Behörden in der Zwischenzeit eingestellt.
December 16, 2025

Tiersektionstisch

Laborausstattung
June 11, 2025

Vertikaler Strömungsreiniger

Laminar-Flow-Reinigungsbank
June 11, 2025